Gravel Calculator

Home / Compare

No. 57 stone vs Crusher Run

The same area needs the same cubic yards of either one, but crusher run weighs about 16% more per yard, which changes the tonnage and often the price.

ft
ft
ft
sq ft
in
%

First material

tons
$

Second material

tons
$

Enter your numbers and press Calculate.

Side by side

No. 57 stoneCrusher Run
Nominal size1 in to No. 4–
Measured weight range1.29 to 1.47 t/yd³1.50 t/yd³
Weight per cubic yard2,576 lb (1.29 t)3,000 lb (1.50 t)
Cubic yards per ton0.780.67
Sq ft per ton at 3 in8472
Average price–$24–$34/ton

Weights and prices from the sources listed below.

Hello Gravel describes the difference this way: road base (crusher run) keeps its fines and packs hard, while No. 57 is clean stone that lets water move through it. Road base goes underneath as the foundation, with No. 57 or driveway gravel on top.

Working it out

Cubic yards = area × depth ÷ 324 (sq ft and inches). Tons = cubic yards × weight per cubic yard.

For 200 sq ft at 3 inches, both need 1.85 cubic yards: 2.39 tons of no. 57 stone or 2.78 tons of crusher run.

Common questions

Which is heavier, no. 57 stone or crusher run?

Crusher Run at about 1.50 tons per cubic yard, against 1.29.

Sources

  • https://hellogravel.com/products/road-base/
  • https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/15034/003.cfm
  • https://selectsg.com/how-much-does-a-yard-of-crushed-stone-weigh/
  • https://www.gravelshop.com/blog/crusher-run-what-is-it-9.asp
  • https://homeguide.com/costs/gravel-prices