Hot Tub Gravel Pad Calculator

Work out the crushed stone for a hot tub pad. Premier Pools & Spas calls for 4 to 6 inches compacted, on a pad 6 to 12 inches larger than the spa.

ft
ft
ft
sq ft
in
Premier: 4 to 6 in compacted, in 2 to 3 in layers.
tons
Change it to your supplier's figure.
%
Rochester Concrete Products' install guide adds 10% for compaction and uneven ground.
cu ft
Quikrete's 50 lb all-purpose gravel bag holds about 0.5 cu ft.
$

Enter your numbers and press Calculate.

How deep to go

UsePublished figureSource
Compacted crushed stone4 to 6 inpremierpools.com
Pad size beyond the spa6 to 12 in on every sidepremierpools.com
Crushed stone minimum (Site Prep)4 insiteprep.com

Premier Pools & Spas tells owners to mark an area 6 to 12 inches larger than the spa on all sides, add crushed stone in 2- to 3-inch layers and compact each one, for 4 to 6 inches total. Site Prep says a properly built pad has at least 4 inches of crushed stone and a border to hold it, and that an 8 × 8 ft pad on level ground takes about 1 ton. Check your spa maker's warranty terms before you build.

Working it out

Cubic yards = area (sq ft) × depth (in) ÷ 12 ÷ 27. Tons = cubic yards × weight per cubic yard.

Example: 9 × 9 ft at 4 inches with 10% extra is 1.10 cubic yards of no. 57 stone, about 1.42 tons at 1.29 tons per cubic yard.

Rochester Concrete Products' install guide adds 10% for compaction and uneven ground.

Common questions

How much gravel do I need for a hot tub pad?

Measure the area, choose a depth from the table above and enter both in the calculator. It gives cubic yards, tons and bags.

Should I order extra?

Rochester Concrete Products' install guide adds 10% for compaction and uneven ground. Loose stone also compacts, so a compacted layer needs more loose material than its finished depth suggests.

Sources

  • https://premierpools.com/blogs/hot-tub-info-customer-guides/spa-site-preparation
  • https://www.siteprep.com/gravel-bases-for-hot-tubs/
  • https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/15034/003.cfm